Timeline
75 tasks sorted by date (2025-12-01 to 2026-02-20)
| Task | Progress | Section | Start | Due | Duration | Status | Notes | Notes | Team | Tags |
|---|---|---|---|---|---|---|---|---|---|---|
| Define product vision and success metrics | Done | Backlog | 2025-12-01 | 2025-12-15 | ● On track | This is a critical foundational task that will guide all subsequent work on the mobile app redesign.... | Product | planning strategy | ||
| Initial project setup | Done | Done | 2025-12-01 | 2025-12-10 | ● On track | — | — | Engineering | setup infrastructure | |
| Conduct user research interviews | Done | Backlog | 2025-12-05 | 2025-12-20 | ▲ At risk | Schedule and conduct 15-20 user interviews across different segments: - Power users (5-6... | Design | research ux | ||
| Competitor analysis report | Done | Done | 2025-12-05 | 2025-12-20 | ● On track | Comprehensive analysis of 8 competitor apps covering: feature comparison, UX patterns, pricing... | Product | research analysis | ||
| Code review guidelines | Done | Done | 2025-12-10 | 2025-12-18 | ● On track | — | — | Engineering | process documentation | |
| Localization for 5 new languages | Done | Reviewing | 2025-12-10 | 2025-12-28 | ● On track | Added support for: Japanese, Korean, Portuguese (BR), Polish, and Turkish. All strings reviewed by... | Product | localization i18n | ||
| Set up crash reporting | Done | Done | 2025-12-13 | 2025-12-20 | ● On track | Implemented Crashlytics for iOS and Android with custom keys for debugging. Set up alerts for crash... | Engineering | infrastructure monitoring | ||
| Define API contracts | Done | Done | 2025-12-13 | 2025-12-25 | ● On track | OpenAPI 3.0 specification completed for all 47 endpoints. Includes request/response schemas,... | Engineering | api documentation | ||
| Create design mockups - home screen | Done | Done | 2025-12-14 | 2025-12-28 | ● On track | — | — | Design | design mockups | |
| Database migration script | Done | Done | 2025-12-14 | 2025-12-22 | ● On track | Migration script for schema changes supporting new features. Includes rollback capability and data... | Engineering | database migration | ||
| Security penetration testing | Done | Done | 2025-12-15 | 2026-01-05 | ● On track | Third-party penetration test completed. 2 medium and 5 low severity issues identified and... | QA | security testing audit | ||
| Weekly status report automation | Done | Done | 2025-12-15 | 2025-12-22 | ● On track | — | — | Product | process automation | |
| User settings page redesign | Done | Reviewing | 2025-12-15 | 2026-01-08 | ● On track | Reorganized settings page with improved information architecture. Grouped related settings, added... | Design | design settings ux | ||
| Memory leak fixes | Open | Reviewing | 2025-12-18 | 2025-12-30 | ● On track | Fixed 3 memory leaks identified in the performance audit: 1. Image cache not clearing on low memory... | Engineering | bug performance critical | ||
| API versioning strategy | Done | Testing | 2025-12-20 | 2026-01-10 | ● On track | Implement API versioning to support gradual rollout of new endpoints while maintaining backward... | Engineering | api architecture | ||
| Error handling standardization | Done | Done | 2025-12-20 | 2026-01-05 | ● On track | Standardize error messages and handling across the app. Create consistent error UI components with... | Engineering | quality error-handling | ||
| Implement pull-to-refresh | Done | Done | 2025-12-20 | 2025-12-28 | ● On track | — | — | Engineering | feature ux | |
| Analytics event tracking update | Done | Reviewing | 2025-12-22 | 2026-01-07 | — | — | — | Engineering | analytics tracking | |
| Empty state illustrations | Open | Reviewing | 2025-12-22 | 2026-01-05 | ● On track | Create friendly empty state illustrations for: - Empty cart - No search results - No notifications -... | Design | design ux illustrations | ||
| Fix: Keyboard covering input fields | Done | Done | 2025-12-24 | 2025-12-30 | ● On track | — | — | Design | bug ux | |
| Documentation: Release notes template | Done | Done | 2025-12-26 | 2025-12-28 | ● On track | — | — | Product | documentation process | |
| Search functionality redesign | Open | Testing | 2025-12-28 | 2026-01-14 | ● On track | New search implementation with: - Autocomplete suggestions - Recent searches - Voice search... | Engineering | feature search ux | ||
| Skeleton loading screens | Open | Testing | 2025-12-28 | 2026-01-08 | ● On track | Replace spinner loaders with skeleton screens throughout the app. Provides better perceived... | Design | ux design loading | ||
| SSL certificate renewal | Done | Done | 2025-12-31 | 2026-01-05 | ● On track | — | — | Engineering | infrastructure security | |
| Refactor authentication module | Done | Doing | 2026-01-02 | 2026-01-18 | ● On track | The current auth module is tightly coupled and difficult to test. Refactor to use dependency... | Engineering | security refactor | ||
| Integration testing - payment flow | Done | Testing | 2026-01-02 | 2026-01-12 | ● On track | — | — | QA | testing payments integration | |
| Performance baseline documentation | Open | Reviewing | 2026-01-02 | 2026-01-10 | ● On track | Document current performance metrics as baseline: - App launch time: 2.3s (cold), 0.8s (warm) -... | Engineering | documentation performance | ||
| Push notification improvements | Done | Done | 2026-01-03 | 2026-01-15 | ● On track | Enhance push notifications with rich media support, action buttons, and improved targeting. Add user... | Engineering | feature notifications | ||
| Build new dashboard widgets | Open | Doing | 2026-01-05 | 2026-01-22 | ▲ At risk | Implement the 6 new dashboard widgets as specified in the design mockups: 1. Activity summary... | Engineering | feature dashboard | ||
| Audit current codebase for technical debt | Done | To do | 2026-01-05 | 2026-01-15 | ■ Off track | — | — | Engineering | technical-debt audit | |
| Accessibility audit and fixes | Open | Testing | 2026-01-05 | 2026-01-18 | ▲ At risk | Complete accessibility audit using Axe, VoiceOver, and TalkBack. Document all issues and implement... | QA | accessibility compliance audit | ||
| Fix: Deep link handling on cold start | Open | Testing | 2026-01-05 | 2026-01-12 | ● On track | — | — | Engineering | bug deep-links | |
| Rate limiting implementation | Open | Testing | 2026-01-05 | 2026-01-14 | ● On track | — | — | Engineering | security api infrastructure | |
| Implement feature flags system | Open | Doing | 2026-01-06 | 2026-01-18 | ● On track | Set up LaunchDarkly or similar for feature flag management. This enables: - Gradual rollouts - A/B... | Engineering | infrastructure feature-flags | ||
| Performance optimization - image loading | Open | Testing | 2026-01-06 | 2026-01-14 | ● On track | Implement lazy loading, progressive image loading, and WebP format support. Target: reduce initial... | Engineering | performance optimization | ||
| Design review - dashboard iteration 2 | Open | Reviewing | 2026-01-06 | 2026-01-10 | ● On track | Second iteration of dashboard design incorporating feedback from stakeholder review. Key changes:... | Design | design review | ||
| Implement offline mode | Open | Doing | 2026-01-08 | 2026-02-01 | ▲ At risk | Add offline support using local SQLite database with background sync. Handle conflict resolution for... | Engineering | feature offline sync | ||
| Write unit tests for cart module | Done | Doing | 2026-01-08 | 2026-01-19 | — | — | — | QA | testing quality | |
| Session timeout handling | Open | Doing | 2026-01-08 | 2026-01-15 | ● On track | Implement graceful session timeout handling: - Show warning 5 min before expiry - Allow session... | Engineering | security ux | ||
| Set up CI/CD pipeline for mobile builds | Done | To do | 2026-01-08 | 2026-01-20 | ● On track | Configure automated build and deployment pipeline: - iOS builds via Xcode Cloud or Fastlane -... | Engineering | devops infrastructure | ||
| Fix: Cart total calculation error | Open | Testing | 2026-01-08 | 2026-01-14 | ● On track | Rounding errors in cart total when applying percentage discounts. Need to implement proper decimal... | Engineering | bug high-priority | ||
| Create wireframes for new navigation | Open | Doing | 2026-01-10 | 2026-01-25 | ● On track | Based on user research findings, design new navigation patterns that address the top 5 usability... | Design | design ux navigation | ||
| Fix: Profile image upload crash | Open | Doing | 2026-01-10 | 2026-01-12 | ● On track | Users experiencing crashes when uploading profile images larger than 5MB. Need to implement image... | Engineering | bug critical crash | ||
| Implement biometric authentication | Open | Doing | 2026-01-10 | 2026-01-22 | ● On track | Add Face ID/Touch ID support for iOS and fingerprint/face unlock for Android. Store auth tokens... | Engineering | feature security authentication | ||
| ↳ SUBTASK: iOS biometric setup | Open | Doing | 2026-01-10 | 2026-01-15 | ● On track | — | — | Engineering | ios | |
| Design system color palette update | Done | Doing | 2026-01-10 | 2026-01-17 | ● On track | Update color palette to meet WCAG 2.1 AA contrast requirements. Current palette fails contrast... | Design | design design-system accessibility | ||
| ↳ Toast notification component | Open | Testing | 2026-01-10 | 2026-01-16 | ● On track | Implement toast notifications with auto-dismiss, action buttons, and queue management for multiple... | Engineering | design-system components | ||
| Load testing - API endpoints | Open | Testing | 2026-01-10 | 2026-01-17 | ▲ At risk | Load test all critical API endpoints: - Target: 10,000 concurrent users - Response time P99 <... | QA | testing performance api | ||
| ↳ SUBTASK: Biometric UI components | Open | To do | 2026-01-12 | 2026-01-18 | ● On track | — | — | Design | design ui | |
| Create component library documentation | Done | To do | 2026-01-12 | 2026-01-28 | — | — | — | Design | documentation design-system | |
| ↳ SUBTASK: Android biometric setup | Open | To do | 2026-01-15 | 2026-01-20 | — | — | — | Engineering | android | |
| Design new onboarding flow | Open | To do | 2026-01-15 | 2026-01-30 | ▲ At risk | Create a streamlined onboarding experience that reduces time-to-value. Current onboarding has a 40%... | Design | design onboarding ux | ||
| Fix: Notification badge count sync | Open | To do | 2026-01-15 | 2026-01-18 | ▲ At risk | Badge count on app icon not syncing correctly with actual unread notifications. Need to implement... | Engineering | bug notifications | ||
| Set up A/B testing framework | Open | To do | 2026-01-18 | 2026-01-30 | ● On track | — | — | Engineering | infrastructure testing analytics | |
| ↳ Button component - implement variants | Done | To do | 2026-01-18 | 2026-01-22 | ● On track | Create primary secondary and tertiary button variants with loading and disabled states. | Engineering | design-system components | ||
| Write E2E tests - login flow | Open | To do | 2026-01-20 | 2026-01-28 | ● On track | Automated end-to-end tests for: - Email/password login - Social login (Google, Apple, Facebook) -... | QA | testing e2e automation | ||
| Documentation: API integration guide | Done | To do | 2026-01-20 | 2026-02-01 | ● On track | Write comprehensive API integration guide for third-party developers. Include authentication, rate... | Engineering | documentation api | ||
| Optimize bundle size | Open | To do | 2026-01-20 | 2026-02-01 | ● On track | Reduce app bundle size by 20%: - Remove unused dependencies - Implement tree shaking - Compress... | Engineering | performance build optimization | ||
| Implement dark mode support | Open | To do | 2026-01-20 | 2026-02-05 | ■ Off track | Add system-level dark mode support with manual override option. Ensure all color tokens are properly... | Engineering | feature accessibility ui | ||
| ↳ Input field component - validation states | Open | To do | 2026-01-22 | 2026-01-26 | — | — | — | Engineering | design-system components | |
| Stakeholder demo preparation | Open | To do | 2026-01-25 | 2026-01-30 | ▲ At risk | — | — | Product | demo communication | |
| Data export functionality | Open | To do | 2026-01-25 | 2026-02-08 | ● On track | Implement user data export feature for GDPR compliance. Users should be able to request and download... | Engineering | feature gdpr compliance | ||
| ↳ Modal component - animations | Open | To do | 2026-01-26 | 2026-01-30 | ● On track | — | — | Engineering | design-system components animation | |
| Write E2E tests - checkout flow | Open | To do | 2026-01-28 | 2026-02-05 | — | — | — | QA | testing e2e automation | |
| Beta testing recruitment | Open | To do | 2026-01-28 | 2026-02-10 | ● On track | Recruit 200 beta testers across segments: - 50 power users - 100 regular users - 50 new users Set... | Design | testing beta users | ||
| Update privacy policy for new features | Open | Backlog | 2026-02-01 | 2026-02-10 | — | — | — | Product | legal compliance privacy | |
| App store listing update | Open | Backlog | 2026-02-01 | 2026-02-15 | ▲ At risk | Update App Store and Play Store listings with new screenshots, feature descriptions, and promotional... | Product | marketing app-store | ||
| Implement app rating prompt | Open | Backlog | 2026-02-10 | 2026-02-20 | ● On track | Add smart app rating prompt that triggers after positive interactions. Follow Apple and Google... | Engineering | feature engagement | ||
| Review third-party SDK licenses | Done | Backlog | — | — | No dates | ● On track | Audit all third-party SDKs for license compliance. Ensure attribution requirements are met. Flag any... | Product | legal compliance audit | |
| Implement haptic feedback | Done | Backlog | — | — | No dates | — | Add haptic feedback for key interactions: button taps, pull-to-refresh, successful actions. Should... | Engineering | feature | |
| Animation performance audit | Open | Backlog | — | — | No dates | ■ Off track | — | — | Engineering | performance animation |
| Research: AR feature feasibility | Open | Backlog | — | — | No dates | — | Investigate feasibility of AR try-on feature for product visualization. Evaluate ARKit/ARCore... | Design | research ar future | |
| Research: Voice command integration | Open | Backlog | — | — | No dates | — | — | — | Engineering | research voice accessibility |
| Gradient background performance | Open | Backlog | — | — | No dates | ▲ At risk | Investigate and optimize gradient background rendering. Currently causing frame drops on older... | Design | performance ui | |
| Implement widget customization | Open | Backlog | — | — | No dates | — | Allow users to customize dashboard by adding, removing, and reordering widgets. Save preferences to... | Design | feature customization ux |